Foundation Repair - Ready for the Next Push Pier Tube
Once a section of galvanized steel tubing is in place the ram is withdrawn making room for the next section of the push pier tubing. Each section of tubing is load tested as it is being installed and the PSI reading from the hydraulic pump is recorded.